Design partner places are open
New beginnings, together.

Run the floor as one.

Racks, power, cooling, capacity and the work that keeps them running. Read from the BMS and EPMS you already have, written to the record everyone else uses.

Neev · DC Ops

From the first hall to the last decommission.

Six moves. Every one of them lands on the same rack object the CRM and the NOC see.

NeevSites / Site A / Hall 2D

Every rack. In context.

Hall 2 · Power, cooling and capacity

NOV 2026
IT load1.42 MWof 1.8 MW
Headroom118 kWFeeder 2
PUE1.3824-hour view
Hall 2 / rack map52U racks
60 positions

Scroll the floor · select a rack to inspect

LiveReservedAlarmAvailable
!Rack 2B-14 · inlet 41.2 °C · incident attached↗
Readings linked to the rackrk_2b14
Interactive preview · sample dataSelect a record to explore

01

Map the floor.

Sites, halls, rows, racks, power paths and cooling zones as one model. Imported from DCIM and drawings, reconciled to one ID per object.

  • Hall model
  • Power path
  • Cooling zones
Hall 2 · row map
HALL 2 / EQUIPMENTISOMETRIC VIEW
CRAH C3 · 27.4 °C returnCRAH C4 · 22.1 °C supplyRack 2B-12 · 8 kW IT loadGenerator G2 · Standby readyRack 2B-13 · 9 kW IT loadRack 2C-12 · 12 kW IT loadRack 2B-14 · 41.2 °C inletRack 2C-13 · 13 kW IT loadPDU 2B-07 · 118 kW headroomRack 2B-15 · 11 kW IT loadRack 2C-14 · 14 kW IT loadRack 2C-15 · Capacity reservedRack 2B-14 · 41.2 °C inlet
Rack 2B-14alarm
41.2 °C inlet

An inlet alarm connects this rack to Northwind, its cooling response and INC-20417. One asset, with every dependency attached.

Northwind · NW-117 · INC-20417
Select a unit to see its shared record.Sample equipment view

02

Read power and cooling.

Utility to UPS to PDU to breaker, CRAH to row to inlet. Live readings and alarms arrive through connectors and attach to the asset they came from.

  • EPMS
  • BMS
  • Per-rack inlet
Hall 2 · live
IT load1.42 MWof 1.8 MW
Feeder 2118 kWheadroom
PUE · 24 h1.38target 1.35
Inlet max41.2 °Crack 2B-14 · alarm

03

Capacity and headroom.

Space, power and cooling headroom per hall, row and feeder, with reservations from Ayana already subtracted. Stranded kilowatts show up as a number, not a rumour.

  • Headroom
  • Stranded kW
  • Reservations
Headroom · by feeder
Feeder 1
14 kW
Feeder 2
118 kW
Feeder 3
156 kW
Feeder 4 · reserved
51 kW
Cooling · CRAH C
ok

04

Work orders and PPM.

Planned maintenance, installs, moves and remote hands as work orders on the asset, with windows, approvals and the change they belong to.

  • PPM
  • Installs
  • Remote hands
Work · this week23 open
WOAssetTypeWindowState
WO-8812UPS BPPM · quarterlyThu 02:00Approved
WO-8819Rack 2C-19..24Install · NWFri 10:00Scheduled
WO-8823CRAH C3Filter changeSat 06:00Awaiting parts
WO-8825PDU 2B-07Breaker set-pointThu 09:30CHG-5531

05

Alarms into incidents.

An alarm becomes an incident in the shared queue with the rack, the customer and the SLA attached. The NOC and facilities work the same item.

  • Shared queue
  • SLA attached
  • Customer attached
Alarm → incident
Inlet high · rack 2B-14 · 41.2 °Cfrom EcoStruxure
Incident INC-20417 openedNorthwind · SLA 99.99 · clock started
CHG-5531 · raise CRAH C3 set-pointapproved · M. Keller
Inlet 27.4 °C · clearingauto-resolve in 30 min

06

Handover and decommission.

Energised racks become billable in Ayana on the day. Decommissioned ones stay in the record as history, with everything that ever happened to them.

  • Energised → billable
  • History kept
Rack 2C-07 · lifecycle
CreatedDay 0 · from NW-117
Power pathFeeder 2 → PDU 2C-02
EnergisedDay 9 · 14:20 · billable
Alarms · lifetime3
Changes · lifetime7
Statelive · 412 days

What makes Neev different.

It is DC operations on the same record as the contract and the ticket.

01

Reads, does not replace

Your BMS, EPMS and DCIM stay. Neev reads them through connectors with owners and mismatch reports.

  • ConnectorsModbus, BACnet, SNMP, OPC UA and vendor APIs.
  • One IDA rack is one object, however many tools name it.
  • Mismatch reportWhat still disagrees, by source.

02

Capacity the CRM can trust

Headroom is computed per feeder and row with reservations already subtracted, and Ayana reads it live.

  • Stranded kWFound and sold.
  • ReservationsHeld against quotes, with expiry.
  • Energised = billableNo handover spreadsheet.

03

Work with a chain

Every work order belongs to a change, every change to an asset and an approval. Audit packs assemble themselves.

  • PPMScheduled from the asset, not a calendar.
  • ApprovalsWindows and sign-offs kept.
  • HistoryDecommissioned is a state.

Running a BMS, an EPMS and a DCIM that have never met? Bring an alarm you had to chase by phone and we will replay it on the record.

Speak to our experts →

Works with the stack you already run.

Neev speaks to the building through the protocols and vendors you already have on the floor.

BMS

Cooling, environment, alarms.

Schneider EcoStruxureSiemens DesigoHoneywell EBIJohnson Controls MetasysCarrier i-Vusoon

EPMS & power

Meters, breakers, UPS, gensets.

Schneider PowerLogicABB AbilityEatonVertivSiemens SICAMCummins PowerCommandsoon

DCIM & inventory

Racks, assets, cabling.

NlyteSunbird dcTrackEcoStruxure ITDevice42NetBox

Sensors & edge

Where the readings are born.

Modbus TCPBACnet/IPSNMP v2/v3OPC UAMQTTLoRaWANsoon

Design partner places are open

Bring one hall. Watch it run as one.

Design partner places are open for operators running 2 MW and up.

We reply personally. Nothing goes on a list. Privacy